- Weekly Update for the Lowson Blvd Improvement Project 9/8/23:
- Crews continued placing sod in the remaining areas along Lowson Blvd between Dover Rd to the Pedestrian Bridge and also along SW 10th St East of the 95 Bridge towards SW 10th Ave.
- Pipe Underdrains were completed at the new gravity walls at the pedestrian bridge.
- Crews also finished framing up and pouring the new concrete shared use path along the North side of SW 10th St between Congress to the RR Tracks.
- Crews began grading the parkways along both the North and South sides of SW 10th St between SW 4th Ave to SW 2nd Ave.
- Drainage work also continued along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
- Upcoming Week of Sept 11th:
- Continue Installation of Sod along SW 10th St between SW 10th Ave to the 95 Bridge.
- Continue installation of new Curbs and shared use path along SW 10th St between SW 2nd Ave to Swinton.
- Continue installation of new drainage along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
- Motorists can expect minor delays traveling thru the Work Zone Areas
September 8, 2023