• Weekly Update for the Lowson Blvd Improvement Project 8/11/23:
    • SW 10th St between SW 4th Ave and SW 8th Ave was reopened on 8/5/23.
    • New school zone signage with flashers was added along SW 10th St at Pine Grove Elementary.
    • Crews continued working along SW 10th St between SW 10th Ave to SW 15th Ave on the south side of the roadway for the new concrete curb & gutters and shared use path.
    • Crews began excavating and installing the new curb & gutters at the intersection of SW 10th St and SW 10th Ave in both the SW and SE corners.
    • Grading in the parkways and prepping the remaining areas for sod took place along Lowson Blvd between Dover Rd to the pedestrian bridge.
  • Upcoming Week of August 14th:
    • Construction of the new shared use paths and curb & gutters along the south side of SW 10th St between SW 10th Ave to SW 15th Ave will continue.
    • Continue installing the new curb & gutters and sidewalks at the intersection of SW 10th St and SW 10th Ave in the SW and SE corners.
    • Work at the pedestrian bridges will continue on the West side for the new gravity walls for the approach slabs.
    • Installation of sod in the remaining areas along Lowson Blvd between Dover Rd to the pedestrian bridge.
    • Drainage work along SE 10th St between Old Dixie Hwy to SE 4th Ave is scheduled to begin.
  • Motorists can expect minor delays traveling through the work zone areas.