• Weekly Update for the Lowson Blvd Improvement Project 3/10/23
    • Work along the North side of SW 10th St between SW 17th St to SW 11th Ave continues with preparation/excavation for the new Concrete Sidewalks.
    • Drainage work continued along Lowson Blvd/SW 10th St between SW 17th Ave to SW 10th Ave at installing new drainage structures and adjusting existing structures for the new improvements.
    • Crews continued working along SW 10th St on the south side, between S. Swinton Ave to SW 4th Ave installing new Curb & Gutters and sidewalks.
  • Upcoming Week of March 13th
    • Continue working along SW 10th St between SW 17th Ave to SW 10th Ave with drainage improvements and new concrete sidewalks and curb & gutters.
    • Continue working along SW 10th St between S. Swinton Ave to SW 4th Ave with adding new curbs and sidewalks along the south side of SW 10th St.
  •  Motorists can expect minor delays traveling thru the Work Zone Areas.