Weekly Update for the Lowson Blvd Improvement Project 1/27/23
- Crews continued with framing up and pouring new concrete Type F Curbs along the North side of Lowson Blvd between the Canal Bridge towards Congress, as well as pouring new sections of the concrete Shared Use Path.
- Crews also continued with grading and shaping the remaining parkways along Lowson Blvd between Dover Rd to Homewood and getting ready for placing sod.
- Drainage work also began along Lowson Blvd/SW 10th St between SW 16th Ave to SW 11th Ave at installing new drainage structures.
Upcoming Week of January 30th thru February 3rd:
- Continue with framing up and pouring concrete for the new Type F Curbs and Shared Use Path along the North and South sides of Lowson Blvd between the Canal Bridge towards Congress.
- Install new sod in the parkways along Lowson Blvd between Dover Rd to Homewood Blvd.
- Continue with the new Drainage Improvements along SW 10th St/Lowson Blvd between SW 16th Ave to SW 11th Ave.
Motorists can expect minor delays traveling thru the Work Zone Areas.