    • Project Update for the Week of November 26th:
      • The contractor continued installing new drainage structures along the North side of Lowson Blvd between SW 20th Ct to Canal Bridge.
      • Crews also poured more of the concrete shared-use path along the South side of Lowson Blvd between Homewood Blvd to Flame Vine Ave.
    • Upcoming Week of December 5th:
      • Continue drainage installation along Lowson Blvd between SW 20th Ct to the Canal Bridge.
      • Continue pouring concrete for the Shared-Use path along Lowson Blvd between Dover Rd to Homewood Blvd.
      • Install new curbs at the intersection of Lowson Blvd and Homewood Blvd.
      • Begin working on driveways along Lowson Blvd between Camino Rd to the Canal East of Homewood Blvd.
    • Motorists can continue to expect minor delays traveling thru the Work Zone Area.