- Project Update for the Week of November 26th:
- The contractor continued installing new drainage structures along the North side of Lowson Blvd between SW 20th Ct to Canal Bridge.
- Crews also poured more of the concrete shared-use path along the South side of Lowson Blvd between Homewood Blvd to Flame Vine Ave.
- Upcoming Week of December 5th:
- Continue drainage installation along Lowson Blvd between SW 20th Ct to the Canal Bridge.
- Continue pouring concrete for the Shared-Use path along Lowson Blvd between Dover Rd to Homewood Blvd.
- Install new curbs at the intersection of Lowson Blvd and Homewood Blvd.
- Begin working on driveways along Lowson Blvd between Camino Rd to the Canal East of Homewood Blvd.
- Motorists can continue to expect minor delays traveling thru the Work Zone Area.