Weekly Update for the Lowson Blvd Improvement Project

    • Week of October 3rd:
      • Crews installed new drainage structure S-111 on the North side of Lowson Blvd just East of Del Aire Ave.
      • Crews began installing sod along the back side of the new Shared-Use path between Camino Rd to Homewood Blvd.
    • Upcoming Week of October 10th:
      • Continue with grading and prepping the remaining sections of the Shared-Use path on both the North and South side of Lowson Blvd between Dover Rd to Homewood Blvd.
      • Continue with installing sod in locations that are ready for placing sod along the Shared-Use Path.
      • Possibly begin new drainage improvements/structures along Lowson Blvd between SW 10th Court to the Canal Bridge.
    • Motorists can continue to expect minor delays traveling thru the Work Zone Area.