- Weekly Update for the Lowson Blvd Improvement Project 9/15/23:
- Crews continued placing sod along SW 10th St between the 95 Bridge towards SW 10th Ave.
- Crews poured the concrete sidewalks in the SE corner of SW 10th St at SW 10th Ave.
- Crews continued pouring new concrete curb & gutters and shared use path along the north side of SW 10th St between SW 2nd Ave to Swinton Ave.
- Drainage work also continued along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
- Crews completed the new sidewalk/ADA ramp at Lowson Blvd and the Delray Abbey Entrance.
- Upcoming Week of Sept 18th:
- Begin grading the parkways along SW 10th St between SW 4th Ave to SW 2nd Ave and prepping areas for sod.
- Continue with installation of new curbs and shared use path along SW 10th St between SW 2nd Ave to Swinton.
- Continue with installation of new drainage along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
- Finish installing the sidewalk located along the south side of Lowson Blvd near Dover Rd at the Canal.
- Motorists can expect minor delays traveling thru the Work Zone Areas