• Weekly Update for the Lowson Blvd Improvement Project 9/15/23:
    • Crews continued placing sod along SW 10th St between the 95 Bridge towards SW 10th Ave.
    • Crews poured the concrete sidewalks in the SE corner of SW 10th St at SW 10th Ave.
    • Crews continued pouring new concrete curb & gutters and shared use path along the north side of SW 10th St between SW 2nd Ave to Swinton Ave.  
    • Drainage work also continued along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
    • Crews completed the new sidewalk/ADA ramp at Lowson Blvd and the Delray Abbey Entrance.
  • Upcoming Week of Sept 18th:
    • Begin grading the parkways along SW 10th St between SW 4th Ave to SW 2nd Ave and prepping areas for sod.
    • Continue with installation of new curbs and shared use path along SW 10th St between SW 2nd Ave to Swinton.
    • Continue with installation of new drainage along the south side of SE 10th St between Old Dixie Hwy to SE 4th Ave.
    • Finish installing the sidewalk located along the south side of Lowson Blvd near Dover Rd at the Canal.
  • Motorists can expect minor delays traveling thru the Work Zone Areas

Comments are disabled