• Weekly Update for the Lowson Blvd Improvement Project 6/2/23
    • New Drainage work continued along the south side of SE 10th St between SE 2nd Ave to SE 4th Ave.
    • Crews began framing up for the new concrete abutments which will support the new Pedestrian Bridges along Lowson Blvd at the Canal Bridge just West of Congress.
    • Excavation, framing and pouring concrete for the new Shared Use Path along the south side of SW 10th Street between SW 17th Ave to SW 12th Ave continued.
    • Excavation for the Shared Use Path on the North side of SW 10th St from SW 17th Ave to the Railroad Crossing began.
  • Upcoming Week of 6/5/23
    • Continue along the South side of SW 10th Street between SW 10th Ave to SW 17th Ave with excavating and framing up and pouring the new concrete shared use path.
    • Begin pouring the new Concrete Shared Use path along the North side of SW 10th St from SW 17th Ave to the Railroad Crossing.
    • Continue with Drainage work along SE 10th St between SE 2nd Ave to S. Dixie Hwy.
    • Continue framing up and setting rebar for the new Pedestrian Bridge abutments along Lowson Blvd at the Canal Bridge East of Congress.
  • SW 10th Street Road Closure to begin the week of June 5, 2023:
    • SW 10th Street is scheduled to be closed to Thru Traffic during the reconstruction of the roadway between SW 4th Ave to SW 8th Ave. This work will include removal of the existing roadway, installation of new road base and pavement, along with new Concrete curbs, Sidewalks and driveways.
    • The roadway closure is expected to last from June 5th  thru August 4th while Pine Grove Elementary is out of session for the summer.
    • Detour Route will be set up to detour traffic to the North on SW 4th Ave and SW 8th Ave and to use SW 4th Street to the East and West.
  • Motorists can expect minor delays traveling thru the Work Zone Areas