- Weekly Update for the Lowson Blvd Improvement Project 3/17/23
- Work continued along the North side of SW 10th St between SW 17th St to SW 10th Ave with crews grading for the new Concrete Sidewalks and Curb & Gutters.
- Drainage work continued along Lowson Blvd/SW 10th St between SW 17th Ave to SW 10th Ave at installing new drainage structures and adjusting existing structures for the new improvements.
- Work continued along SW 10th St on the south side, between S. Swinton Ave to SW 4th Ave grading & pouring Concrete Curb & Gutters and sidewalks, as well as working on new drainage structures.
- Upcoming Week of March 20th:
- Continue working along SW 10th St between SW 17th Ave to SW 10th Ave with drainage improvements and new concrete sidewalks and curb & gutters.
- Continue working along SW 10th St between S. Swinton Ave to SW 4th Ave with adding new curbs and sidewalks along the south side of SW 10th St as well as installing new drainage structures.
- Motorists can expect minor delays traveling thru the Work Zone Areas
- Pedestrian Bridge Work to Begin March 27th!
- Construction of the new Pedestrian Bridges at the Canal Bridge between Congress and Homewood Blvd is scheduled to begin the week of March 27th.
- Daytime Pile Driving Activities during this time will require Lowson Blvd to be closed during the daytime work activities scheduled between 7am to 5pm.
- Detour Route will be posted which detours traffic to the south to Linton Blvd to get between Congress and Homewood Blvd.