- Weekly Update for the Lowson Blvd Improvement Project
- Project Update for the Week of September 5th
- Crews repaired the trench across Lowson Blvd at Structures S101-S102.
- Crews began setting up the dewatering system for installation of new drainage structure S-104 to S-105 and 18” French drain pipe.
- Crews also continued with grading and shaping the swales/ditches along the North & South side of Lowson Blvd between Homewood Blvd to the Canal East of Homewood.
- Upcoming Week of September 12th
- Installation of the new drainage structures S104 to S105 with the 18” French drain pipes to continue along the North side of Lowson Blvd between Dover Rd to Homewood Blvd.
- Grading of the parkways swales/ditches will also continue along both side of Lowson Blvd between Homewood Blvd to the Canal Bridge East of Homewood.
- Motorists can continue to expect minor delays traveling thru the Work Zone Area.
- Project Update for the Week of September 5th
September 9, 2022